Neville Hill 195 fleet facility: Northern Trains plans outline designs
- Northern Trains Limited
- Yorkshire and the Humber
- 23 March 2027 to 31 December 2027
Northern Trains Limited plans to buy outline designs for a facility at Neville Hill to maintain the Northern 195 fleet. The work starts with a feasibility assessment and an options appraisal, so that Northern can pick one option to take forward to design.
Each element of the facility needs its own appraisal. The study must cover the electrified roads, lighting, access for staff and materials, and how movements on the depot are controlled, along with other operating limits. Northern plans a session to set out the draft scope in more detail.
The nine-month contract is estimated at £2.1m and is due to run to December 2027. It is marked as suitable for small businesses.
- What
- Rail infrastructure design and technical consultancy
- Estimated value
- £2.1m
- How it will be bought
- Not published
- Responses due
- 25 Sep 2026
- Contract dates
- Mar 2027 to Dec 2027