Neville Hill 195 heavy maintenance outline designs for Northern Trains
- Northern Trains Limited
- Yorkshire and the Humber
- Open procedure
- 18 March 2027 to 18 January 2028
Northern Trains Limited wants outline designs for a facility at Neville Hill to carry out heavy maintenance on its 195 fleet. It must cover electrified roads, movement control, walkways and lighting, as well as the layout, operational constraints and engineering infrastructure standards. Each element gets a feasibility assessment and an options appraisal, so Northern's stakeholders can choose one best option to take forward to design. The work would be let under a JCT Consultancy Agreement.
Quality counts for 60% of the score, price for 30% and social value for 10%. Northern marks the tender as suitable for small businesses.
The work is estimated at £2.1m. The deadline for bids is 23 November 2026, and the work is due to start in March 2027.
Closes in 1 day· 23 Nov 2026
- What
- Rail infrastructure design and technical consultancy
- Estimated value
- £2.1m
- How it is being bought
- Open procedure
- Bids due
- 23 Nov 2026
- Contract dates
- Mar 2027 to Jan 2028