Old Hungerford Road active travel study goes to Urban Movement
- Oxfordshire County Council
- South East
- Limited
- 16 March 2026 to 14 September 2026
Oxfordshire County Council hired Urban Movement to study and design active travel improvements on Old Hungerford Road.
Urban Movement's brief was a feasibility study and a preliminary design. The firm assessed the corridor and developed designs to inform later infrastructure plans, with a focus on safety and sustainable transport links.
The contract was worth £28,975. It was due to end in September 2026, and could run to March 2027 at the latest.
- What
- Highway and traffic engineering design
- Supplier
- Urban Movement
- Value
- £28,975
- How it was bought
- Limited
- Dates and next
- Mar 2026 to Sep 2026
- Option to Mar 2027