Contract awardedLocal area energy planning and energy infrastructure feasibility

Dormanstown Depot microgrid feasibility study goes to Decerna

Redcar and Cleveland Borough Council commissioned Decerna Limited to study whether a microgrid at Dormanstown Depot would be feasible.

The study was a standalone piece of work on a proposed microgrid at the one depot site. The council awarded it directly, under an exemption. The £45,000 contract ran for three months from January 2026.

What
Local area energy planning and energy infrastructure feasibility
Value
£45,000
How it was bought
Direct award
Dates and next
Jan 2026 to Apr 2026

How it was bought

1 official notice
  1. 20 Dec 2025Award noticeNEPO
  2. 2 Jan 2026Contract starts
  3. 2 Apr 2026Contract ends

How it compares

With every local area energy planning and energy infrastructure feasibility award since 2021

Half of awards fall between £45,000 and £167,456Median £80,000

Awards
404
Firms that won them
175
Median award
£80,000
of 385 with a value
This award
Smaller than 76%
of them
Typical length
6 months
In North East
15 awards

Decerna Limited ranks 57th of 175 firms for local area energy planning and energy infrastructure feasibility awards since 2021.

RankFirmAwardsValue
1Locked32£13.3m
2Locked27£5.41m
3Locked17£5.05m
4Locked16£2.68m
5Locked14£5.4m
6Locked13£1.03m
57Decerna Limited Won this one1£45,000
See who wins this work

Figures to 25 November 2026

Local area energy planning and energy infrastructure feasibility at other buyers

Redcar and Cleveland Borough Council has awarded 981 contracts since 2021.

See Redcar and Cleveland Borough Council's page
  • Decerna Limited has won 1 public contract since 2021.

3 local area energy planning and energy infrastructure feasibility tenders are open now

See them
More local area energy planning and energy infrastructure feasibility contracts awarded in 2025