Chloride installs two new UPS systems for Sellafield after a failure
- Sellafield Ltd
- North West
- Direct
- 15 January 2026 to 15 May 2026
Sellafield Ltd awarded Chloride a contract to supply, install and commission two uninterruptible power supply (UPS) units.
A catastrophic failure of the existing UPS left Sellafield needing urgent replacements, along with cover against any future failures. The UPS systems inside each CSM/LSM were CE marked, and work by a third party would have voided that marking. That would have breached a mandatory Sellafield Ltd requirement.
Sellafield awarded the work directly. An existing framework with Chloride did not cover this scope, and the project team found no other route to market. The award was £197,294, while the notice text puts the work at £164,412 excluding VAT. The contract was due to end in May 2026, with an option to run to June 2026.
- What
- Standby generators and UPS
- Buyer
- Sellafield Ltd
- Supplier
- Chloride
- Value
- £197,294
- How it was bought
- Direct
- Dates and next
- Jan 2026 to May 2026
- Option to Jun 2026