Vitrification plant control system spares for Sellafield come from ABB
- Sellafield Ltd
- North West
- Direct
- 10 March 2026 to 30 July 2026
Sellafield Ltd bought critical spares for the distributed control system at its waste vitrification plant from ABB, which made the original system.
The control system was ageing and close to obsolete. Holding spares was meant to make the plant more resilient, which in turn protected Sellafield's work on the highly active liquor (HAL) stream.
Sellafield awarded the order directly to ABB in January 2026 at £977,689. The supply contract was due to end in July 2026.
- What
- Industrial control, SCADA and telemetry systems
- Buyer
- Sellafield Ltd
- Supplier
- ABB
- Value
- £977,689
- How it was bought
- Direct
- Dates and next
- Mar 2026 to Jul 2026