Axle counter power supply design for TfL comes from Ramboll
- Transport for London
- London
- Call-off from a framework agreement
- 4 May 2026 to 3 November 2026
Transport for London hired Ramboll to design replacements for signalling power supply units, as part of the Windrush Line core renewal strategy.
The work covered 16 existing units at seven locations. They supplied 48V DC power to the axle counter evaluators for the Up and Down lines. Ramboll was to specify modern equivalents approved by Network Rail, so the signalling stayed safe and reliable.
TfL ordered the design as a call-off from a framework agreement and awarded it in April 2026 at £133,104. The six-month contract was due to end in November 2026.
- What
- Rail infrastructure design and technical consultancy
- Buyer
- Transport for London
- Supplier
- Ramboll
- Value
- £133,104
- How it was bought
- Call-off from a framework agreement
- Dates and next
- May 2026 to Nov 2026