DLR Thamesmead Extension gas diversion study for TfL goes to Cadent
- Transport for London
- London
- Direct award
- 14 August 2026 to 24 February 2027
Transport for London commissioned Cadent Gas Limited to study the gas diversions the proposed DLR Thamesmead Extension may need. The planned route crosses a dense part of Cadent's London gas network. It includes the Beckton Above Ground Installation, pressure reduction equipment and gas mains at high, intermediate and medium pressure. TfL counts these assets among the biggest technical and programme risks to the extension.
The C3 stage study is a desktop assessment of every possible diversion and any rationalisation of the above ground installation. Cadent is to bring in a Cadent-approved design house, develop options and estimate costs for later phases. It also sets up a project management team for the work.
TfL awarded the £1,594,000 contract directly in June 2026. It is due to end in February 2027.
Contract ends February 2027
- What
- Power and utility network engineering
- Buyer
- Transport for London
- Supplier
- Cadent Gas Limited
- Value
- £1.59m
- How it was bought
- Direct award
- Dates and next
- Aug 2026 to Feb 2027