Palace of Westminster arc flash study goes to Schneider Electric
- UK Parliament
- London
- Direct
- 28 November 2025 to 27 November 2026
UK Parliament hired Schneider Electric to study arc flash risk across the low voltage electrical network in the Palace of Westminster.
The study analyses electrical safety risks across the palace's existing infrastructure and checks it against safety standards.
Parliament awarded the £49,778 contract directly, without a competition. It runs from November 2025 to November 2026.
Contract ends November 2026
- What
- Power and utility network engineering
- Buyer
- UK Parliament
- Supplier
- Schneider Electric
- Value
- £49,778
- How it was bought
- Direct
- Dates and next
- Nov 2025 to Nov 2026