Tanygrisiau heat network: Ynni Ystradau wants RIBA Stage 3 design
- Ynni Ystradau
- Wales
Ynni Ystradau wants consultants to take a water source heat pump and heat network for Tanygrisiau, North Wales, to RIBA Stage 3 design. The network would heat around 200 homes, a handful of non-domestic buildings and the Rehau factory. Heat would come from the lake water, and two local hydro schemes would power the heat pump.
Lot 1 covers the heat pump, heat extraction from the reservoir and thermal and electrical storage. Lot 2 covers the detailed design of pipework routes, zoning and a phased build plan. Bidders would produce 3D BIM models and commit to community benefit training.
No estimate has been published. The deadline for bids is 20 November 2026.
Closed 20 Nov 2026
- What
- Local area energy planning and energy infrastructure feasibility
- Buyer
- Ynni Ystradau
- Estimated value
- Not published
- How it is being bought
- Not published
- Bids due
- 20 Nov 2026
- Contract dates
- Not published