Fabrication and Delivery of Melter Platform Steel Structure
Supply of 802,000kg of S355 steel structure and 48,100kg of S235 steel structure for the Shotton Manufacturing facility at Deeside. Scope includes creation of fabrication and erection drawings, protective painting, inspection and test reports, and supply of anchors, bolts, and washers, with installation completed by others.
Closes in 7 days· 19 October 2026
- Estimated value
- Not published
- No value in the notice
- Published
- 22 September 2026
- Sell2Wales
- Deadline
- 19 October 2026
- 7 days left
- Contract length
- Not stated