UK Power Networks to move 132kV Cut Throat Lane station for East West Rail
- East West Rail
- Direct award
- 27 November 2026 to 19 November 2033
East West Rail is paying UK Power Networks to move a 132kV switching station out of the railway's path north of Bedford.
The station, at Fairfield Park / Cut Throat Lane, sits where the planned six-track corridor will run. The corridor is part of the East West Rail programme of new and upgraded links between Oxford, Milton Keynes, Bedford and Cambridge. UK Power Networks will design, build and commission a replacement station and take the old one out of service. It must switch services over to the new station while keeping supply running.
Only the licensed distribution network operator for these assets may carry out the works, and that is UK Power Networks. So East West Rail awarded the £22.1m contract directly in November 2026, to run to November 2033.
Contract ends November 2033
- What
- Electricity network works and connections
- Buyer
- East West Rail
- Supplier
- UK Power Networks
- Value
- £22.1m
- How it was bought
- Direct award
- Dates and next
- Nov 2026 to Nov 2033