Contract awardedRail infrastructure design and technical consultancy

Great Yarmouth railway station feasibility study goes to Holder Mathias

Great Yarmouth Borough Council commissioned Holder Mathias LLP to study how Great Yarmouth railway station could be improved and refurbished.

The study was carried out with Greater Anglia. It also took a wider look at the station site and the development opportunities emerging around it.

Holder Mathias was awarded the £30,000 contract in March 2026, and the work was due to finish in May 2026.

What
Rail infrastructure design and technical consultancy
Value
£30,000
How it was bought
Not published
Dates and next
Mar 2026 to May 2026

How it was bought

1 official notice
  1. 17 Mar 2026Award noticeFind a Tender
  2. 17 Mar 2026Contract starts
  3. 30 May 2026Contract ends

How it compares

With every rail infrastructure design and technical consultancy award since 2021

Half of awards fall between £67,484 and £525,000Median £198,240

Awards
239
Firms that won them
72
Median award
£198,240
of 233 with a value
This award
Smaller than 93%
of them
Typical length
1 year
In East of England
8 awards

Holder Mathias LLP ranks 28th of 72 firms for rail infrastructure design and technical consultancy awards since 2021.

RankFirmAwardsValue
1Locked34£9.48m
2Locked26£29.2m
3Locked21£47.4m
4Locked18£6.9m
5Locked15£4.06m
6Locked11£22.3m
28Holder Mathias LLP Won this one1£30,000
See who wins this work

Figures to 21 November 2026

Rail infrastructure design and technical consultancy at other buyers

Great Yarmouth Borough Council has awarded 93 contracts since 2021.

See Great Yarmouth Borough Council's page
  • Holder Mathias LLP has won 1 public contract since 2021.

1 rail infrastructure design and technical consultancy tender is open now

See it
More rail infrastructure design and technical consultancy contracts awarded in 2026